Thornton Road Bridge Duplication

The NSW Government is investing $50 million towards duplicating Thornton Road Bridge over the Main North railway.

Transport for NSW (Transport) will be duplicating Thornton Road Bridge to provide four lanes across the Main North railway at Thornton. The project will help ease congestion along Thornton Road at this known bottleneck.

The close proximity of the existing bridge to the traffic lights at Glenroy Street causes congestion at this pinch point, which a second two lane bridge will help alleviate. Transport for NSW has investigated upgrade options along this section to improve traffic flow and safety for all users, while helping meet the future needs of an increased population and employment in the area.

A preferred design has been developed for the proposed upgrade, which includes providing four lanes across the Main North railway to increase the reliability and capacity of Thornton Road. This will help ease congestion along Thornton Road at the traffic lights on Glenroy Street, especially during peak periods.

Transport for NSW invited feedback on the concept design for the Thornton Road Bridge Duplication in November 2025.

Thank you to everyone who provided feedback, all comments received will be considered as we move to finalise the concept design.

A report will be prepared and shared with the community in response to feedback received.

Find out more about the project at nswroads.work/thorntonrb

The NSW Government is investing $50 million towards duplicating Thornton Road Bridge over the Main North railway.

Transport for NSW (Transport) will be duplicating Thornton Road Bridge to provide four lanes across the Main North railway at Thornton. The project will help ease congestion along Thornton Road at this known bottleneck.

The close proximity of the existing bridge to the traffic lights at Glenroy Street causes congestion at this pinch point, which a second two lane bridge will help alleviate. Transport for NSW has investigated upgrade options along this section to improve traffic flow and safety for all users, while helping meet the future needs of an increased population and employment in the area.

A preferred design has been developed for the proposed upgrade, which includes providing four lanes across the Main North railway to increase the reliability and capacity of Thornton Road. This will help ease congestion along Thornton Road at the traffic lights on Glenroy Street, especially during peak periods.

Transport for NSW invited feedback on the concept design for the Thornton Road Bridge Duplication in November 2025.

Thank you to everyone who provided feedback, all comments received will be considered as we move to finalise the concept design.

A report will be prepared and shared with the community in response to feedback received.

Find out more about the project at nswroads.work/thorntonrb

  • CLOSED: This survey has concluded.

    Have your say on the Thornton Road Bridge Duplication preferred design by completing the form below.

    Personal Information Collection Notice: Transport for NSW is committed to protecting your privacy and ensuring your personal and health information is managed according to law. Find out why we collect your personal information and how we use and manage it by reading our privacy statement or phone 13 22 13 to request a copy.

Page last updated: 01 Dec 2025, 09:47 AM